how much and how long would it take?
thanks
how much and how long would it take?
thanks
Just a ten second neon
Rickey,a rollbar is good to 10.0
past that you need a cage,"8.50" and slower or next in line will be a 25.x cert
right now i am about 2 weeks out on taking more work in.
Check out our NEW online store!
http://store.clocksoffracing.com/
A rollbar and thats it?? I was talking to Tim Zimmer and he said i would need the rollbar that goes over seats, and to back of car, then the two ones that run along bottom of door??
Just a ten second neon
to run 11.0 its just a plain bar.
to run 10.0 and slower its a 6/8 point rollbar (back bars/door bars/hoop kickers)
to run 8.50 and slower its a cage
to run 8.49 or faster its a 25.x cage
considering how close you are already to 9.99 i would steer you toward an 8.50 cage
we just got a stockpile of tubing in,awaiting the neon.
Check out our NEW online store!
http://store.clocksoffracing.com/